Prefabricated elements in an industrialized process whose base is SELF-SUPPORTING MODULES in reinforced concrete composed of slabs and walls
Factory built
Stackable for multi-storey buildings by crane
Structural stability guaranteed with 'Global Engineering' connections, tested in the I.S. Technical University
50% quicker than conventional construction
30% cost reduction
80% of construction, kitchens and bathrooms in factory
Interiors and exteriors designed to meet your needs
Thermal and acoustic insulation
Less energy and less waste
Speed up to 70% faster than normal construction methods
Greater security and less disruption due to 90% fewer vehicle movements
Deadline security not affected by weather conditions
Up to 90% less waste than traditional construction
Uses up to 67% less energy to build than traditional construction
You can start production earlier before the start of the construction or work permit
Controlled costs with faster construction times and controlled conditions
Warranties in compliance with national legislation
Transport & Assembly Global Engineering's responsibility